Norwin A/S

  • PDM ensures complete control of both versions of BOM’s, 3D models and manufacturing drawings
  • Make designs based on configurations and variant construction in the 3D CAD system

UTFORDRINGEN

Norwin A/S develops customized wind turbines manufactured by licensees. Previously the entire development of the wind turbines was done using a 2D CAD system. The manual updates of information can sometimes result in differences in the information found in the BOM’s, Excel spread sheets as well as the information found in the 2D CAD drawings. Therefore the expectations to the effects of implementing SolidWorks Enterprise PDM were high.

Norwin A/S

LØSNINGEN

The PDM system will ensure complete control of both versions of BOM’s, 3D models and manufacturing drawings and the history about other types of information to licensees. The licensees will ultimately be linked more closely to the PDM system, so information can also be controlled via the system.

In addition to 3D CAD and PDM Norwin has also taken SolidWorks Simulation for FEM analysis and strength calculations as well as simulation of movements.

Bransjer: Engineering Services