Svenska Teknikingenjörer AB (Sting)

  • SolidWorks Simulation solved very big tasks
  • Great cooperation with PLM Group
  • After the simulation we meet the required standards

UTFORDRINGEN

The biggest challenge in doing the simulations needed for an optimal construction of the bascule bridge was the physical size and sleek design of the bridge, says Albin Särndahl, who is an engineer with Sting.

Svenska Teknikingenjörer AB (Sting)

LØSNINGEN

The 3D CAD model of the draw bridge was originally constructed in another 3D CAD system, but Sting preferred to make it ready for construction with SolidWorks because the company believes SolidWorks Simulation is the best to resolve the simulation tasks. The company currently has two SolidWorks licenses. Albin Särndahl says that Sting are quite pleased to collaborate with PLM Group: ”We’ve had training with PLM Group, and we have regular contact with the support department. We are very pleased with the cooperation,” he stresses.

Produkter: SOLIDWORKS 3D CAD, SOLIDWORKS Simulation

Bransjer: Engineering Services